
FEATURED PROJECT / TENNESSEE
Large-Scale Shampoo Production
From Design to Installation
Two 10-metric-ton mixing vessels and one 4-metric-ton vessel, connected with vacuum equipment, transfer pumps and a separate CIP system.
PROJECTS & SERVICE STORIES
Equipment projects, installation and field service from the Encap team. Explore the photographs, decisions and hands-on work behind each story.

FEATURED PROJECT / TENNESSEE
From Design to Installation
Two 10-metric-ton mixing vessels and one 4-metric-ton vessel, connected with vacuum equipment, transfer pumps and a separate CIP system.
A feed interruption initially looked like a sensor or powder-flow problem. The service record points to the sensing arrangement as the issue that needed correcting.
High capsule rejection led to a review of tamping pins, upper and lower segments, capsule separation and air pressure as one connected process.
Capsules were being damaged and the pneumatic system was not functioning. The visit addressed both the pump connection and station pressure.
Incorrect cutting intervals called for attention to both the sensor and the way the strip traveled through the machine.
A team preparing to operate an automatic capsule filler needed practical guidance on assembly and changing capsule sizes.
Hands-on instruction connected material loading, forming, sealing, cutting and changeover with the operator’s daily checks.
START WITH YOUR EQUIPMENT