GHL-400 & FG-120 / PROJECT STORY
Wet Granulation & Fluid Bed Dryer Installation
From equipment selection to trial production.
A GHL-400 wet granulator and FG-120 fluid bed dryer project: equipment selection, delivery, onsite installation, SOP development, operator training and trial production. The project connected machinery, site preparation and the people who would operate and clean the equipment.
DESIGN & EQUIPMENT SELECTION
Designed for the formulation.
For a wax-based sustained-release application, the GHL-400 was configured with a heated jacket around the mixing bowl and a wax-melting tank mounted above it. Molten wax can be added to the powder and mixed in the heated bowl.
The planning layout coordinated this configuration with the FG-120 fluid bed dryer, access platforms, control cabinets and site connections. A 2,000 L hot-water tank was included for the clean-in-place (CIP) cleaning system.
SHIPPING & DELIVERY
Carry the plan through to the site.
The project then moved from equipment selection into shipment and delivery. Arrival and equipment positioning had to be coordinated with the space needed for lifting, assembly and connections.
This stage links the transport plan with the practical work of bringing the machines and their supporting components into the installation area.
POSITIONING & ONSITE ASSEMBLY
Bring the equipment together.
On site, the team positioned the equipment and assembled the fluid-bed dryer’s main sections and supporting connections. The installation film follows the work as individual assemblies became a complete equipment arrangement.
Access for installation, operation and cleaning remained part of the picture as the granulator and dryer were put in place.
CONNECTIONS & COMMISSIONING
Check the connected system.
Mechanical assembly was followed by utility connections and functional checks. The commissioning record covers the granulator’s mixing and cutting functions, gas seals and safety interlocks, together with the dryer’s blower, heaters, filter-bag locking and shaking mechanisms.
Cleaning connections and clean-in-place (CIP) functions were also included in the commissioning scope.
OPERATING & CLEANING SOPs
Put the working sequence into writing.
Operating and cleaning SOPs captured the sequence from equipment preparation and material loading through granulation, dryer setup, drying, shutdown and cleaning.
The written procedures gave the production team a reference for the controls, filter setup, gas seals and cleaning steps covered at the machines.
HANDS-ON OPERATOR TRAINING
Work through the routines together.
Hands-on training took the written procedures back to the machines. The team worked through controls and parameters, filter-bag fitting and locking, gas seals, interlocks and the cleaning routine, including CIP operation.
This connected the operating sequence with the parts that staff would handle, check and clean during day-to-day work.
TRIAL PRODUCTION & PROCESS REVIEW
Follow the material through the process.
Trial production followed the material from dry mixing and binder addition into wet milling and fluid-bed drying. With a heat-sensitive formulation, the trial identified oversized wet granules as a bottleneck in reaching the target moisture level.
The team used additional milling and drying during the trial. A finer wet-mill screen was recommended for review in the next round of process work.
PROJECT RECORDS & FOLLOW-UP
Keep the next steps clear.
The project records brought together commissioning observations, operating and cleaning procedures, training and trial findings. They also identified the wet-milling adjustment to review next, supporting continued work with the production team.
SOP training at the machines helped the production team connect the written procedures with day-to-day operation and cleaning.