ENCAP NORTH AMERICA
Encap North America — Packaging | Servicing | Equipment

Softgel

Ancillaries

Complete your softgel process with selected drying, preparation and handling accessories. Include each item only where it serves your formulation and production flow.

  • Drying & handlingtrays and trolleys
  • Preparation optionsreview process requirements
  • Inspectionarrange product handling
Equipment overview

A CLOSER LOOK

Choose the accessories
your process needs.

Review the equipment photographs alongside the application, access and changeover requirements for your process.

Drying trays and trolleys
01 / MACHINE DETAILS

Drying trays and trolleys

Plan handling and drying capacity for the selected process.

Gelatin preparation accessory
02 / MACHINE DETAILS

Gelatin preparation accessory

Review the required gelatin preparation step and equipment scope.

Inspection and handling table
03 / MACHINE DETAILS

Inspection and handling table

Select the product-handling and inspection arrangement for your team.

Catalogue equipment photographs; the selected model, tooling and appearance are confirmed with your quotation.

HOW IT WORKS

Connect the supporting
process steps.

Follow the main stages, then review the settings and acceptance criteria with our team using your own product.

  1. 01

    Define the process

    List the preparation, drying and handling duties.

  2. 02

    Select accessories

    Match each item to its duty and required capacity.

  3. 03

    Connect the flow

    Coordinate transfers between the main process stages.

Process overview · Actual equipment sequence and configuration are selected for your application.

CONFIGURATION & SELECTION

Softgel process ancillaries / CONFIGURATION REFERENCE

Know what you
are selecting.

Catalogue selection reference. Output depends on the product, tooling and operating conditions. Final specifications, utility loads and supplied options are confirmed for the machine in your quotation.

Bring these details to the discussion
  • Softgel formulation and selected main line
  • Preparation, drying and handling capacity
  • Cleaning access, room layout and transfer routine
Softgel process ancillaries configuration reference
Accessory scopeDrying trays / trolleys, preparation and inspection equipment as selected
Capacity and quantitiesConfirmed item by item in the quotation
Need the configuration sheet or layout?Ask our team for the model-specific specifications, utility requirements and equipment scope for your project. Technical details are confirmed in your quotation.

SUPPORT THROUGH PRODUCTION

The equipment is
only the beginning.

Practical support from selection through production. Services, scheduling and responsibilities are agreed for your project.

Select & plan

Review the application, equipment scope, FAT and delivery plan before the machine ships.

Discuss your project

Install & start up

Arrange installation assistance, commissioning, operator training and production coaching.

Explore startup support

Keep production moving

Talk with our San Diego team about maintenance, troubleshooting, parts and repair.

Ask for technical support

EQUIPMENT FINANCING

Plan the machine.
Explore the payment options.

Ask about financing for an eligible equipment purchase, with an equipment quote and payment terms reviewed together.

Financing is subject to approval and program availability.

Catalogue specification

Confirm the exact model, current configuration, utilities and included equipment with our team before ordering.

Download catalogue spec sheet (PDF) · 861 KB
Ancillaries