ENCAP NORTH AMERICA
Encap North America — Packaging | Servicing | Equipment

Softgel

Tanks for Softgel Processing

Select gelatin melting, gelatin holding and fill-material preparation tanks around the encapsulation line. Review each tank’s role, working volume and temperature requirements.

  • Gelatin preparationmelting and holding
  • Fill preparationmixing and storage
  • Line coordinationworking volume and temperature
Equipment overview

A CLOSER LOOK

Preparation and holding
serve different jobs.

Review the equipment photographs alongside the application, access and changeover requirements for your process.

Jacketed gelatin holding
01 / MACHINE DETAILS

Jacketed gelatin holding

Coordinate holding capacity and temperature with the encapsulation process.

Gelatin melting
02 / MACHINE DETAILS

Gelatin melting

Select melting and conditioning scope for the shell formulation.

Fill preparation
03 / MACHINE DETAILS

Fill preparation

Match mixing, temperature and handling to the liquid fill formulation.

Catalogue equipment photographs; the selected model, tooling and appearance are confirmed with your quotation.

HOW IT WORKS

Prepare separately.
Feed the encapsulator.

Follow the main stages, then review the settings and acceptance criteria with our team using your own product.

  1. 01

    Define each duty

    Separate gelatin preparation from fill preparation.

  2. 02

    Prepare

    Apply the selected mixing and thermal conditions.

  3. 03

    Hold

    Maintain material under the required conditions.

  4. 04

    Transfer

    Supply the selected encapsulation stage.

Process overview · Actual equipment sequence and configuration are selected for your application.

CONFIGURATION & SELECTION

Softgel preparation and holding tanks / CONFIGURATION REFERENCE

Know what you
are selecting.

Catalogue selection reference. Output depends on the product, tooling and operating conditions. Final specifications, utility loads and supplied options are confirmed for the machine in your quotation.

Bring these details to the discussion
  • Gelatin and fill formulations with process temperatures
  • Working batch sizes, holding duration and line demand
  • Heating / cooling, mixing and product transfer requirements
Softgel preparation and holding tanks configuration reference
Tank rolesGelatin melting, gelatin holding, fill preparation and fill holding
CapacitySelected by batch and line demand
Thermal controlJacket and utility scope confirmed per tank
Need the configuration sheet or layout?Ask our team for the model-specific specifications, utility requirements and equipment scope for your project. Technical details are confirmed in your quotation.

SUPPORT THROUGH PRODUCTION

The equipment is
only the beginning.

Practical support from selection through production. Services, scheduling and responsibilities are agreed for your project.

Select & plan

Review the application, equipment scope, FAT and delivery plan before the machine ships.

Discuss your project

Install & start up

Arrange installation assistance, commissioning, operator training and production coaching.

Explore startup support

Keep production moving

Talk with our San Diego team about maintenance, troubleshooting, parts and repair.

Ask for technical support

EQUIPMENT FINANCING

Plan the machine.
Explore the payment options.

Ask about financing for an eligible equipment purchase, with an equipment quote and payment terms reviewed together.

Financing is subject to approval and program availability.

Catalogue specification

Confirm the exact model, current configuration, utilities and included equipment with our team before ordering.

Download catalogue spec sheet (PDF) · 882 KB
Tanks for Softgel Processing