
Bulk bottle feeding
Review bottle loading and the selected feed arrangement.
Counter & Packing
Orient empty bottles and supply them to the production line. Select the unscrambling setup around the exact bottle shape and dimensions.
A CLOSER LOOK
Review the equipment photographs alongside the application, access and changeover requirements for your process.

Review bottle loading and the selected feed arrangement.

Match the orientation system to your actual bottle geometry.

Review bottle stability, outlet spacing and downstream transfer.
Catalogue equipment photographs; the selected model, tooling and appearance are confirmed with your quotation.
HOW IT WORKS
Follow the main stages, then review the settings and acceptance criteria with our team using your own product.
Load the compatible empty bottles.
Present bottles to the orientation system.
Orient the bottles for the downstream line.
Transfer the upright bottles at the required spacing.
Process overview · Actual equipment sequence and configuration are selected for your application.
CONFIGURATION & SELECTION
CPLP bottle unscrambler / CONFIGURATION REFERENCECatalogue selection reference. Output depends on the product, tooling and operating conditions. Final specifications, utility loads and supplied options are confirmed for the machine in your quotation.
| Station reference | CPLP bottle unscrambler |
|---|---|
| Electrical configuration | 220V; phase and 60Hz supply confirmed by selected machine |
COMPARE CONFIGURATIONS
Compare catalogue model references. Confirm the selected model and demonstrated results for your product before ordering.
Scroll across to compare models →
| Model | CPLP-160 | CPLP-200 |
|---|---|---|
| Output | 20-160 bottles/min | 60-200 bottles/min |
| Power | 0.3kw | 0.5kw |
| Air Pressure | 0.5MPa | 0.5MPa |
Catalogue references · Capacity, output and operating settings depend on the selected format and product. Final parameters are confirmed in your quotation.
SUPPORT THROUGH PRODUCTION
Practical support from selection through production. Services, scheduling and responsibilities are agreed for your project.
Review the application, equipment scope, FAT and delivery plan before the machine ships.
Discuss your projectArrange installation assistance, commissioning, operator training and production coaching.
Explore startup supportTalk with our San Diego team about maintenance, troubleshooting, parts and repair.
Ask for technical supportEQUIPMENT FINANCING
Ask about financing for an eligible equipment purchase, with an equipment quote and payment terms reviewed together.
Financing is subject to approval and program availability.
Confirm the exact model, current configuration, utilities and included equipment with our team before ordering.
Download catalogue spec sheet (PDF) · 1.1 MB