ENCAP NORTH AMERICA STICK PACK MACHINE - QUOTATION AND TRIAL BRIEF Updated November 12, 2026 Complete known requirements; leave other decisions open for application review. This checklist does not submit an inquiry or book a trial. 1. PRODUCT AND DOSING Project / contact / installation location: Formulation or liquid identity and representative samples: Material: poor-flow powder / free-flowing powder or granules / liquid / flakes or solid pieces: Target fill weight (mg / g) or liquid dose (mL): Required fill tolerance and the agreed sampling method: Powder flow, bulk density and density variation: Dust, static, moisture sensitivity and material-specific handling needs: Liquid viscosity at filling temperature / foaming / particles: Proposed dosing arrangement: VP-320Y auger / VP-320YL volumetric cups / VP-320P pump / VP-400YW combination weighing: Selection guide: auger for powders with poor flow; volumetric cups for free-flowing powders or granules; pump for liquids; combination weighing for granules, flakes and solid pieces portioned by weight. For granules: choose volume-based cups or weight-based combination weighing around the product. VP-400YW is a separate pouch-packaging configuration; review its format and feeding system. Granule shape, fragility and gentle-handling requirements: Auger and change parts / cup and adjustment / pump and nozzle / combination weigher and feeder scope: Wetted materials, seals and compatibility requirements: Tank or hopper, supply method and required product conditions: Nozzle shutoff, drips, cleanability and product recovery: 2. FINISHED PACKAGE AND ROLLSTOCK Finished package width and length, in (mm): Seal style, end-seal lands, cut and opening features: Code content, location and readability requirements: Approved finished-pack drawing: Film structure, supplier / grade and sealant interface: Film thickness, mil (microns): Film web width, core size and outside diameter, in (mm): Reel weight, lb (kg), and winding direction: Artwork repeat, registration mark and print orientation: Barrier and package-performance requirements / evidence needed: Supplier processing information and representative printed film: Do not substitute finished package width for film web width. 3. OUTPUT AND LANE PLAN Accepted finished packs required per shift: Scheduled shift hours: Non-running hours (setup, cleaning, stops and other downtime): Accepted-pack fraction at the agreed inspection point: Operating lanes under consideration: Gross packs/hour and machine cycles/minute required: Definition of advertised packs/min or cycles/min: Batch sizes, product mix and changeover frequency: Finished-stick collection, counting, cartoning or other downstream needs: Planning formulas (one stick per operating lane per cycle): Running hours = scheduled hours - non-running hours. Gross packs/hour = accepted sticks / running hours / accepted fraction. Required machine cycles/minute = gross sticks/hour / 60 / operating lanes. Non-running time and rejected packs are separate allowances. Planning rates are requirements, not demonstrated machine performance. 4. COMPLETE SUPPLIED EQUIPMENT Exact machine model and configuration: Dosing module, change parts, fill tube / nozzle and product-contact parts: Former and any additional width formats: Longitudinal sealing and transverse sealing / film advance mechanism: Separate cutting or punching arrangement and cutting format: Coding unit and consumables: Loader, product tank or hopper and transfer connections: Discharge conveyor and collection / downstream scope: Checkweighing or inspection, if specified, and reject arrangements: Wear parts, spares, included accessories and separately quoted options: 5. FACILITY AND UTILITIES Required U.S. supply: voltage / phase / frequency for every load: Specify 220 V, 60 Hz and phase explicitly in the current quotation. Connected power for packer, dosing module and each auxiliary device: Compressed-air pressure, psi (bar), and flow, CFM (L/min): Room / product temperature, deg F (deg C), and other required conditions: Dust handling or liquid-management requirements: Footprint and service clearances, in (mm): Access, unloading, positioning and site connections: Material delivery, film loading, cleaning and operator access: 6. TRIAL / FAT / SITE ACCEPTANCE Trial location, machine, dosing system, lane count and format: Product and film identities, quantities and temperatures: Speed, settings, run duration, sampling intervals and acceptance criteria: Measurements by lane, where applicable: Gross output, rejects, accepted output and interruptions: Behavior at startup, refill, restart and changeover: Fill-weight or liquid-dose variation: Pack dimensions, seal checks, coding and opening features: Liquid drips, foaming, leakage and cleaning checks: Inspection / rejection challenges where included: Written results, retained samples and unresolved items: Further package, barrier, stability or product-release testing required: FAT and site-acceptance scope / commissioning and operator training: 7. COMMERCIAL AND SUPPORT SCOPE Itemized inclusions, options, exclusions and format parts: Production coordination, FAT and delivery responsibilities: Freight, customs, trucking, unloading and installation responsibilities: Commissioning, training, maintenance and Encap equipment spares: Warranty terms and service scheduling: Contact: info@encapnorthamerica.com | +1 858 399 3800 www.encapnorthamerica.com