ENCAP NORTH AMERICA ROLLER COMPACTOR - PURCHASE & MATERIAL-TRIAL BRIEF Updated November 5, 2026 Fill in known items and leave other requirements open for technical review. This file does not submit an inquiry or arrange a material trial. 1. MATERIAL AND CURRENT PROBLEM Company / contact / project: Material or formulation / sample identity: Current process and problem to solve: Particle-size distribution and measurement method: Bulk / tapped density and test method: Moisture and measurement method: Compressibility / sticking / temperature sensitivity: Material handling information and special requirements: 2. REQUIRED GRANULES Intended downstream process (capsules / tablets / sachets / other): Target particle-size fraction, sieve apertures and test method: Required bulk density / flow and measurement method: Acceptable fines / oversize / first-pass accepted mass recovery: Downstream acceptance criteria and test responsibilities: Reprocessing permitted? Route, limits and repeat-pass checks: 3. OUTPUT BASIS Accepted granules required: ______ lb/shift (______ kg/shift) Shift hours / cleaning, setup and stops / net running time: Expected FIRST-PASS accepted mass fraction, based on trial: Required fresh feed rate: ______ lb/hour (______ kg/hour) Typical batches / product mix / changeovers: Record fresh feed separately from recycled material. 4. MACHINE AND SUPPORTING EQUIPMENT Proposed model and exact configuration: Feeding, deaeration, roll surface, roll width and discharge: Displayed and recorded force / gap / speed values: Definition of quoted system pressure versus force per roll width: Crusher and any separately supplied classification equipment: Loading / extraction / containers / collection / transfer: Separate cooling circuit and customer connection requirements: Inclusions, options, quantities and customer-supplied items: 5. FACILITY AND UTILITIES Installation ZIP / available room layout: Electrical quotation basis: 220 V, 3-phase, 60 Hz Confirm connected loads for the supplied machine and all auxiliaries: Cooling-water supply / return / duty / connection details: Extraction, grounding and material-specific operating requirements: Doorways / shipping dimensions / floor loading / lifting / access: Operating and service clearance / feed and collection heights: Cleaning, drying, reassembly and changeover plan: 6. TRIAL, FAT AND SITE ACCEPTANCE Available trial quantity / material preparation / handling: Confirmed trial machine, location, settings, duration and sampling: Mass balance: fresh feed / output / accepted fraction / fines / oversize / retained material and losses, as applicable: Granule properties / product temperature / downstream testing: FAT and site-acceptance criteria, methods and responsibilities: Manuals / drawings / records / documentation required: Unresolved technical items and action owners: 7. COMMERCIAL AND STARTUP SCOPE Price validity / currency / delivery basis / payment terms: Freight / customs / trucking / unloading responsibilities: Installation / commissioning / operator training: Wear parts / warranty / Encap equipment service and local parts: Target startup date and quoted lead time: Total installed-cost items and exclusions: Project contact: info@encapnorthamerica.com | +1 858 399 3800